Tata Power to install seven EV charging stations in Bhubaneswar
Published By : Prameya News Bureau | December 27, 2021 IST
Share
Bhubaneswar, Dec 27: The Bhubaneswar Smart City Limited (BSCL) has awarded Tata Power a contract to set up seven Electric Vehicle (EV) charging stations in Bhubaneswar. In the first phase the city will have seven EV charging stations at KIIT area (one fast charger and one slow charger), SUM Hospital (one slow charger), near Esplanade Mall Rasulgarh (one fast charger and one slow charger), DN Regalia (one slow charger), Krishna Plaza CRP Square (one slow charger) will be installed and at later stage more such facilities to be added. Earlier BSCL had convened a meeting on EV charging stations to be built across the city for use by public and the public transport vehicles in near future. The priority on the selection of locations would be given mainly to malls, public parking lots, hotels, residential complexes, workplaces and highways.
News7 Is Now On WhatsApp Join And Get Latest News Updates Delivered To You Via WhatsApp
You Might Also Like
More From Related News
Keonjhar LS: triangular fight to be witnessed in tribal-dominated region
Odisha: Four prominent women candidates in fray in Nabarangpur district
KABIL inks MoU with CSIR-NGRI for advancing geophysical investigations in minerals sector
Earth Day: Vedanta Aluminium accelerates shift to renewables, deploys biomass for power generation
SUM Hospital conducts Odisha’s first haploidentical hematopoitic stem transplantation
Bhubaneswar sizzles at 43. 2 degree C by 2.30 pm, IMD issues orange warning
OJEE 2024: Examination to be held from May 6 to May 10
BJP releases ‘chargesheet’ against BJD, highlights failures of govt
Ailing tusker dies under treatment in Odisha’s Sundargarh
Odisha CM & BJD supremo Naveen Patnaik begins election campaign from Hinjili Assembly constituency